The Journal
The Colorado Department of Transportation and contractor Oldcastle SW Group have resumed work, to complete final earth work, soft shoulder work, seeding and mulching along U.S. Highway 160 south of Cortez near Towaoc. Through April, weather permitting, motorists can expect some intermittent, single-lane closures and/or shoulder closures where roadside work areas are present, from 7 a.m. to 7 p.m., Monday through Friday. Travel delays are anticipated to be very minimal. Motorists are urged to go “Slow for the Cone Zone,” and avoid all distractions while driving through the work areas. Work is expected to be completed by the end of the month.
For more information, email [email protected], call 749-3579 or visit www.codot.gov/admin/projects/us-160-491-passing-lanes.